Top 10 Passive House Window Suppliers for Australia
Home / Blog / Manufacturers & Suppliers
Ten suppliers an Australian Passive House project can buy from — ordered by the evidence behind the claim, not by how often the word passive appears on the home page.
Which suppliers for Passive House windows in Australia publish real evidence?
Ten suppliers serving Australian projects publish enough technical material to be compared. Only one, Paarhammer, names a Passive House Institute component certificate and a Uw of 0.8; Miglas publishes an air-infiltration figure of 0.07. The rest sit on Uw tables, AS 2047 test claims or systems documentation, and this list says which is which.
A Passive House project starts with a performance target and ends with a certificate, and the windows sit in the middle of that journey. Between the two there is a supplier, a factory, a specification and a shipping container, and the quality of the first decision — who makes the units — sets the ceiling on everything that follows. That is why this page does not begin with a definition of Passivhaus. It begins with the only question that survives contact with a real procurement: what has this company actually published, and can a certifier use it?
The Australian market makes that question harder than it looks. Local fabricators sell through builders and installers, systems houses sell profiles to licensed fabricators, importers sell container loads of finished units, and a handful of European and New Zealand brands sell through distribution. Each route publishes a different document set, and the same phrase — passive house certified windows — can mean a PHI component certificate, a WERS label, a Uw figure calculated for one configuration, or nothing at all beyond a product page headline. Comparing them without sorting the evidence first is how projects end up with a window that performs on paper and underperforms on site. Sorting that evidence is the filter applied below to every passive house windows Australia project can shortlist from the nineteen companies checked for this article.
So this list is built on published documents, checked on 27 November 2026 against each company's own website. Every number quoted below appears on the supplier's own domain, and every gap is stated as a gap. Where a supplier publishes an adjective instead of a figure, the entry says so, because a specifier needs to know which of the ten can answer a certifier's request in writing and which will need to be managed.
How this list was built: three tests and one deliberate exclusion
The ranking rests on three tests that a Passive House window has to pass before a certifier will accept it, applied to what each company publishes rather than to what it implies. A supplier can score well on one test and poorly on another; the order in this list reflects how many of the three are documented, and how usable the documentation is for an Australian project. Nothing was scored on reputation, on showroom presence, or on the size of the company.
Test 1 — a named component certificate, not a claim
The Passive House Institute certifies components, not companies. A certified window component carries an identifier, a climate zone, a reference Uw and a set of installation conditions, and it can be looked up in the institute's public component database. A supplier that says its windows are suitable for Passive House is making a statement about performance; a supplier that names a certificate is handing over a document. Only one company in this list does the second, and that single fact reorders the whole ranking.
This matters more in Australia than in central Europe, because the local supply chain is thin. A European buyer can shortlist five certified components inside one country; an Australian buyer is often choosing between a certified component imported in small volumes, a local fabricator working to a published Uw target, and a factory-direct route where the certificate is AS 2047 rather than PHI. All three can deliver a compliant building. Only one of them arrives with a PHI number attached, and pretending otherwise is how a specification loses credibility at the first review.
Test 2 — a Uw figure with a stated boundary condition
A Uw value is meaningless without the configuration it describes: frame series, glass make-up, spacer, gas fill, sash size and the standard it was calculated to. Two suppliers can both publish "Uw 1.4" and be describing different products, which is why this list records the configuration next to the number wherever the supplier states it, and marks the number as unqualified where it does not. A figure published for a fixed pane is not the figure that applies to the opening window in the same elevation, and a figure published for a 1.2 by 1.5 metre test sample does not transfer automatically to a three-metre slider.
Test 3 — airtightness that is measured, not asserted
Airtightness is the test that separates a good window from a Passive House window. It is measured as air infiltration in litres per second per metre of crack, or as an equivalent leakage at a reference pressure, and it is reported in a test certificate. In this list exactly one company publishes a numeric air-infiltration figure, one publishes a test claim without a number, and the rest publish language about seals and gaskets. That distribution is not a criticism of the eight; it is a description of how the Australian window market talks about air, and a buyer who knows it can ask the right question in the first email.
| Evidence you are given | What it proves | What it does not prove |
|---|---|---|
| PHI component certificate with an identifier | The named component was tested and certified for a stated climate zone at a stated Uw | That the unit you order matches the certified configuration, or that the installer will detail it correctly |
| Uw figure on a product page | The supplier has calculated or tested something | Which frame, glass and size the figure belongs to; whether it was calculated to EN ISO 10077 or to a local method |
| WERS label or rating | The unit was rated under the Australian Window Energy Rating Scheme for heating and cooling performance | Air infiltration, or the installed performance of the whole wall |
| AS 2047 test report | Structural, water and air performance to the Australian standard for the tested size | Thermal performance, or Passive House suitability |
| "Energy efficient" or "passive design" language | That the marketing team has read the brief | Anything a certifier can file |
Why ten, and why some well-known brands are missing
Nineteen companies were checked for this article. Fifteen could be read on their own domain, four could not be reached and are named at the end rather than described from memory. Of the fifteen, five were excluded from the ranked ten for reasons that have nothing to do with quality: two are extruders or systems houses that explicitly do not sell finished windows, one is a consumer renovation brand with no published thermal data, one is a louvre specialist whose published Uw range starts at 2.4, and two New Zealand fabricators publish compliance to NZS 4211 but no Uw figure, so they appear in the compliance section rather than the ranking.
That leaves ten entries, which is a coincidence of the evidence rather than a target. A list of ten assembled by reputation would look different and would be less useful: it would put brands with showrooms ahead of brands with certificates, and it would hide the fact that the Australian market has exactly one PHI-certified window component that a residential buyer can actually procure. The point of the ranking is to make that visible before a deposit is paid.
The ten suppliers, ranked on what they publish
The passive house windows Australia buyers are offered fall into three routes — a certified component, a local fabricator working to a Uw target, and a factory-direct import — and the order below runs from the most documented to the least, with one adjustment: a supplier that publishes a certificate but cannot ship to an Australian site sits below one that publishes less but supplies the market. Each entry states the published figure, the condition attached to it, and the gap a buyer has to close. Where a company publishes nothing on a point, the entry says "not published" rather than filling the space with an assumption.
1. Paarhammer Windows & Doors — the only PHI component certificate in the list
Paarhammer publishes the one document that ends most arguments: a Passive House Institute component certification for a triple-glazed timber window, certified for the warm/temperate climate and linked from its own passive house page to the institute's certificate download. The same page states U-values from a very low 0.8 for the timber range and from 1.0 for the wood-aluminium range, with an 82 mm frame depth and argon-filled cavities of 14 to 16 mm in the triple glazing build-up.
That combination — a named certificate, a climate zone and a Uw figure — is what a certifier can actually use. It also tells a buyer what to check next. The certificate belongs to a component, in a stated size and configuration. The unit on a schedule is a different size, possibly a different opening type, and almost certainly a different glass make-up if the project wants solar control for a Melbourne summer or a Hobart winter. The certificate proves the system can reach the target; it does not prove the delivered unit does, and a supplier relationship that cannot produce a project-specific calculation alongside the certificate has not finished the job.
Airtightness is described qualitatively on the same page as very low air infiltration, with no n50 or air-infiltration figure published. Australian standards appear in an advisory article about documents to request from a window supplier, where AS 1288 and AS 2047 are named, but no certificate number is published on the site. None of that undermines the PHI certification; it simply means the Australian compliance pack has to be requested rather than downloaded.
2. Miglas Windows — the only published air-infiltration figure
Miglas publishes the number that most of this list does not: an air infiltration of 0.07, described on its thermal performance page as the best performance of all WERS-tested opening windows. It also publishes a Uw as low as 1.7 for its AliClad suite, a timber-aluminium composite frame with timber inside and aluminium outside, double glazed.
For a Passive House project, that pairing is more useful than a low Uw alone. A window with a good Uw and a poor air seal loses heat through infiltration that no amount of glazing performance recovers, and the infiltration path usually runs through the sash gasket, the lock points and the frame-to-wall junction rather than through the glass. A published 0.07 is a test result a certifier can compare against the specification, and it is the kind of figure that makes a fabricator's claim auditable.
What Miglas does not publish is a Passive House Institute component certification; no Passivhaus or PHI reference appears on its site. Its compliance language is Australian: WER Scheme labels, the Building Code of Australia and AS 2047. The company describes itself as Melbourne-made and supply-only, which matters for programme as much as for compliance, because a supply-only fabricator leaves installation and the airtightness layer to the builder. On a Passive House job that is a real division of responsibility and should be written into the contract rather than assumed.
3. Thermeco Windows — published Uw tables, no airtightness figure
Thermeco publishes a Uw table per system rather than a headline number, which is the right instinct: its EC35TB system is listed at 2.2 for casement and 1.7 for fixed, the EC45 at 3.7 and 2.3, and the EC45TB at 2.5 and 1.9. The spread between fixed and opening units in the same family is exactly the effect that gets lost when a supplier quotes one number for a whole elevation.
The company positions itself around thermal break technology and describes its range as a world leader in thermal break, energy efficient window and door systems — a claim rather than a test result, and treated as such here. It also states that its products are tested to Australian standards and reach BAL 40, which is relevant for projects on the urban-bushfire interface where a thermal requirement and a bushfire requirement collide on the same elevation.
What a Passive House buyer will not find on the site is a PHI component listing, an air-infiltration figure, or a reference to AS 2047 or CodeMark for the window systems themselves. The Uw table is a genuine asset — it lets a specifier model a mixed schedule without waiting for a quote — but it needs to be paired with a project calculation and a compliance pack obtained directly from the company.
4. Ecovue — a uPVC range with a 0.9 claim and a state boundary
Ecovue publishes that its windows are made to achieve U-values of 0.9 W/m²K, on a tilt-and-turn page inside a uPVC double-glazed range. If that figure holds for the unit a project orders, it is a strong number for a uPVC system, and uPVC has a structural advantage in this conversation: a multi-chamber profile with welded corners gives a continuous thermal break without the polyamide strip that aluminium systems depend on.
The caveats are specific. The 0.9 appears as a performance the windows are made to achieve rather than as a tested configuration with a size, glass make-up and spacer called out. Airtightness is described through a four-sided seal and locking mechanism, with no infiltration figure. Compliance language covers AGWA and WERS logos, testing against water ingress, heat loss and weather resistance, and a BAL 29 claim, but no AS 2047 certificate number is published. Supply is described as New South Wales and the ACT, which makes the company relevant to Sydney and Canberra projects and not to a national schedule.
For a Passive House project in those two markets, Ecovue is worth a technical conversation: the profile type is right, the claimed Uw is competitive, and the missing pieces — the test report, the certified configuration, the infiltration figure — are the sort of documents a serious fabricator can produce on request. The entry sits fourth rather than higher because those documents are not on the site where a certifier can read them.
5. Wideline — AS 2047 testing stated, thermal numbers absent
Wideline publishes that its windows are thoroughly performance tested to AS 2047 for water penetration, wind load and air infiltration, and it offers a thermally broken aluminium range under the Desire name alongside aluminium and timber ranges. The AS 2047 claim is the useful part: it tells a specifier that structural, water and air performance has been assessed to the Australian standard, which is the baseline for any window on an Australian project regardless of thermal ambition.
What is not published is a Uw figure, an air-infiltration value, or a Passive House reference; a review of the technical pages and a clean sitemap scan found no thermal numbers to quote. That places Wideline in a familiar category: a capable local fabricator whose thermal performance is established project by project rather than published once. A buyer can still use the company on a Passive House job, but the specification has to carry the performance requirement and the supplier has to answer it in writing, because there is no published figure to design against.
For a builder comparing routes, that difference is the practical meaning of evidence. Two fabricators can both make a good window; only one of them can hand over a number before the contract is signed. Where the design team is comfortable specifying performance and auditing the response, the second kind of supplier is workable. Where the certifier wants documentation at design stage, the first kind saves a month.
6. Altherm Window Systems — the cross-Tasman option with NZS 4211
Altherm, part of the APL group, publishes a ThermalHEART polyamide barrier system with AGP glass, and a Klima uPVC range that offers triple glazing as an option and a 4.5 energy star rating under WEERS. Its compliance statement is the clearest on the New Zealand side: products meet or exceed the New Zealand Building Code and New Zealand Standards, naming NZS 4211 and NZS 4223.
The thermal claim is comparative rather than numeric — ThermalHEART frames are described as delivering almost double the thermal performance of standard, non-thermally improved aluminium windows and doors — and no Uw figure in W/m²K is published. Airtightness is described through the Centrafix system preventing cold air from circulating around the frame, again without a number.
For an Australian project the practical question is not whether the window performs in New Zealand but whether the compliance route transfers. NZS 4211 and AS 2047 are close cousins and not interchangeable; an Australian certifier will want AS 2047 evidence for the delivered units, and a New Zealand fabricator supplying across the Tasman has to be asked how that evidence is produced. Where the answer is a tested system plus a project-specific report, the route works. Where the answer is "the standards are equivalent", the project has a documentation problem, not a performance problem.
7. Trend Windows & Doors — thermal language, no published figures
Trend publishes a ThermaRange of thermally broken aluminium with double glazing, and a ThermaHybrid range described as its latest energy-efficient solution. The technical claim on the site is that the range combines the energy efficiency of double glazing with the style and quality of a thermally broken aluminium frame. That is an accurate description of the product category and not a performance figure.
No Uw value, air-infiltration figure, PHI reference or AS 2047 certificate number is published on the pages reviewed; the passive design material on the site is design guidance for builders rather than a certification statement. Supply is described as Victoria, New South Wales, Queensland and South Australia, with Western Australia and the Northern Territory explicitly out of scope.
In a list ordered by evidence, that places Trend seventh: a national fabricator with the right product architecture and a consumer-facing documentation style. On a project where the builder already knows the thermal target and will hold the supplier to it, the company can compete on service and programme. On a project where the window schedule is being priced before the energy model is fixed, there is nothing published to model against, and the buyer will end up doing the supplier's technical work.
8. Alspec — a systems house, useful for the frame decision
Alspec is a systems supplier, not a window manufacturer, and it belongs in this list for a different reason: it publishes the frame. Its ThermAFrame 101.6 mm flush glazed thermally broken framing is described as a high performance energy efficient framing option, and systems like this are what a licensed fabricator builds a certified window on top of.
That distinction matters when a project is choosing between a finished-window supplier and a fabricator-led route. A systems house supplies profiles, gaskets, thermal breaks and drainage details, and the fabricator supplies the assembly, the glazing and the test evidence. If the frame is not designed as a thermal break with a defined break width and a drainage path that does not compromise it, the glass specification cannot rescue the result.
What Alspec does not publish is a Uw figure, an air-infiltration figure, a PHI component reference or an AS 2047 certificate for finished windows, because those belong to the fabricator who assembles them. A buyer using this route should ask the fabricator, not the systems house, for the performance documents, and should confirm that the fabricator's tested configuration uses the same frame and gasket set that the specification names.
9. AWS Architectural Window Systems — systems only, stated plainly
AWS publishes a clear boundary that more systems houses should copy: it does not sell, manufacture or supply finished windows and doors. Its range includes thermally broken awning and casement windows under the ComfortEDGE series, which is a frame platform for fabricators rather than a product a builder can order directly.
No Uw figure, air-infiltration value, PHI reference or product-level AS 2047 certificate is published on the pages reviewed. That is not a gap in the company's capability so much as a consequence of its position in the chain: the certified performance belongs to the fabricator who assembles and tests the finished unit.
For a specifier, AWS is a way to control the frame decision and a reminder that the thermal performance of an aluminium window is decided at the profile, not at the glass. For a Passive House project the practical instruction is to pick the frame system early, then require the fabricator to demonstrate a tested assembly using it — and to check that the fabricator's certificate names the same system rather than a similar one from the same catalogue.
10. ROPO Windows — the factory-direct route, with AS 2047 but no PHI listing
ROPO manufactures in Fuzhou and exports uPVC and thermally broken aluminium windows and doors to more than 100 countries, with double and triple glazed ranges, a published AS 2047-2014 certificate, NZS 4211 compliance for New Zealand work, Miami-Dade approval for hurricane markets, a ten-year warranty, a minimum order of one unit and Trade Assurance payment terms. The Passive House window range is the relevant starting point, and the factory publishes its AS 2047 certificate rather than describing it.
The honest limitation, for passive house windows Australia buyers would shortlist from this route, is the one this article is built around: ROPO does not publish a Passive House Institute component certificate. Its technical article on how uPVC and aluminium systems meet PHI standards quotes the institute's criteria, including a maximum Uw of 0.80 W/(m²K), but naming a criterion is not holding a certificate, and the site publishes no certificate number or database link. Airtightness figures are not published either.
That places a factory-direct supplier in a specific role on an Australian Passive House project: credible for the fabric, the glazing build-up, the AS 2047 evidence and the price, and dependent on a project-specific calculation and a site-side airtightness strategy for the thermal case. Buyers who need a PHI component certificate should start with entry one. Buyers who need a compliant, repeatable unit at volume, with a documented AS 2047 pack and a factory they can audit, will find the import route competitive — provided the specification states Uw, infiltration and glass make-up as requirements rather than hopes.
| # | Supplier | Route to an Australian site | Frame and glazing | Published Uw | PHI component certificate |
|---|---|---|---|---|---|
| 1 | Paarhammer | Australian manufacturer | Timber and wood-aluminium, triple glazed | From 0.8 (timber), 1.0 (wood-alu) | Yes — warm/temperate, certificate 2195 |
| 2 | Miglas | Melbourne fabricator, supply-only | Timber-aluminium composite, double glazed | As low as 1.7 | Not published |
| 3 | Thermeco | Australian manufacturer | Thermally broken aluminium | 1.7–3.7 by system and type | Not published |
| 4 | Ecovue | NSW and ACT | uPVC, double glazed | 0.9 stated on tilt-and-turn | Not published |
| 5 | Wideline | Australian fabricator | Aluminium, thermally broken range, timber | Not published | Not published |
| 6 | Altherm | New Zealand, cross-Tasman | Thermally broken aluminium, uPVC triple option | Not published in W/m²K | Not published |
| 7 | Trend | VIC, NSW, QLD, SA | Thermally broken aluminium, double glazed | Not published | Not published |
| 8 | Alspec | Systems to licensed fabricators | Thermally broken framing systems | Not published | Not published |
| 9 | AWS | Systems to licensed fabricators | Thermally broken awning and casement systems | Not published | Not published |
| 10 | ROPO | Factory-direct import, Fuzhou | uPVC and thermally broken aluminium, double and triple | Not published as a tested figure | Not published; AS 2047 certificate held |
Who is not ranked, and why. APL Window Solutions and Vistalite both publish NZS 4211 compliance and thermally broken systems but no Uw figure, so they appear in the compliance discussion rather than the ranking. Breezway publishes a Uw range starting at 2.4 for louvre windows, which is a ventilation product rather than a Passive House component. Stegbar publishes no thermal data on the pages reviewed, Capral is an extruder, G.James and A&L could not be reached on the day of checking, and a Chinese candidate that appears in a third-party certification database could not be verified on its own domain and is therefore not described here at all.
A certified European component and a factory-direct unit are not the same product, and the price difference reflects documentation as much as materials. The import route is priced from the opening schedule, with glass make-up, spacer type and gasket specification written line by line.
Passive house windows built to order
Uw values compared: what the numbers mean at an Australian boundary condition
Across the passive house windows Australia projects shortlist, published Uw figures run from 0.8 to a little under 2.0 for whole windows, with fixed units consistently better than opening units in the same system. That spread is real, but it is smaller than the spread created by how the numbers were produced. A Uw calculated for a fixed pane in a certified size, a Uw calculated for a sliding door in a two-metre opening and a Uw measured on a sample in a laboratory are three different statements, and a schedule that compares them side by side is comparing arithmetic with physics.
Reading a Uw figure the way a certifier does
A whole-window U-value is an area-weighted average of the frame, the glass and the spacer, plus the effect of the sash and the installation. Change the glass from double to triple and the number improves; change the frame from a 60 mm system to an 82 mm system and it improves again; make the unit wider and the glass dominates, so the number improves without any component getting better. That is why a supplier can publish a very low Uw honestly and still fail to deliver it on a narrow casement pair in a bathroom.
What a certifier wants is the calculation, not the headline. The calculation names the standard used, the frame Uf, the glass Ug and g-value, the spacer psi value, the size and the opening type. Without those inputs, the number cannot be checked, and an unchecked number in a specification is a liability that surfaces at the worst possible moment — usually after the units are on site. The article on how Uw, Ug and Uf relate sets out the arithmetic in plain terms, and the glass options page shows how the make-up changes with climate and orientation.
Where an Australian climate zone changes the target
Passive House in Australia is not a single target. A project in Melbourne is heating-dominated and wants solar gain in winter plus a frame that does not condense on a cold morning; a project in Brisbane is cooling-dominated and wants shaded glass with a low solar heat gain coefficient; a project in Canberra or the high country wants the lowest Uw the budget can carry and a frame depth that keeps the interior surface above dew point. The same certified component can be right in one market and wrong in another, which is why the PHI certificate states a climate zone and why a supplier that quotes a single Uw without a climate context is answering a question nobody asked.
This is also where the local compliance framework and the Passive House framework diverge. NCC 2022 rewards a combination of glazing and insulation through its energy provisions, and a WERS rating describes heating and cooling load rather than the thermal transmittance of the window. Those metrics are useful and they are not Uw. A project that needs both — a building permit and a Passive House certificate — is running two calculations on the same schedule, and the window supplier has to serve both without the two sets of documents contradicting each other.
Why a low Uw can still fail the check
The most common failure is not the glass. It is the junction between the frame and the wall. A certified component installed with a continuous insulation line that stops at the reveal, a sill that bridges the cavity, or a membrane that is stapled to the frame without sealing the gap will produce a thermal bridge that no Uw figure accounts for. The second most common failure is the opening unit: an inward-opening tilt-and-turn with a good gasket compresses better than a sliding sash, and a schedule that mixes the two without adjusting the calculation produces a building that tests worse than the model predicted.
The third is size. Narrow units have proportionally more frame, and frame is usually the worst-performing element in the assembly. A pair of 600 mm casements in a powder room can miss the target that the same system achieves in a 2,400 mm slider. A supplier who understands this will flag it at quotation stage; a supplier who quotes from a catalogue will not. Ask for the calculation on the smallest and the largest unit in the schedule, and compare the two numbers before the order is placed. The energy-efficient passive house windows and doors range is a useful comparison point when the schedule mixes fixed and opening units.
| Supplier | Published Uw | What the figure belongs to | Boundary condition stated? |
|---|---|---|---|
| Paarhammer | From 0.8 timber, 1.0 wood-aluminium | Triple-glazed timber range, 82 mm frame, warm/temperate certification | Yes — climate zone and frame depth given |
| Miglas | As low as 1.7 | AliClad timber-aluminium suite, double glazed | Partly — suite named, size not stated |
| Thermeco | 2.2 casement / 1.7 fixed (EC35TB); 3.7 / 2.3 (EC45); 2.5 / 1.9 (EC45TB) | Named systems, split by opening type | Yes — system and type given |
| Ecovue | 0.9 | uPVC double-glazed tilt-and-turn | No — stated as a target the range is made to achieve |
| Altherm | Not published in W/m²K | Comparative claim of almost double standard aluminium | Not applicable |
| Others in the list | Not published | — | — |

Airtightness: the number almost nobody publishes
For passive house windows Australia certifiers will accept, air infiltration is the performance gap that separates a thermally good window from a certified one, and in this market it is almost never published. Of the fifteen companies checked, one publishes a numeric air-infiltration figure, one publishes a testing claim without a number, and the rest describe seals, gaskets and locking. For a certifier the difference between those three positions is the difference between a document, a promise and a conversation.
What airtightness actually measures
Air infiltration is measured in a laboratory or on site by pressurising one side of the assembly and measuring the leakage at a reference pressure difference. The result is reported either as a leakage rate per metre of joint or as an equivalent infiltration figure, and it depends on the gasket compression, the number and position of locking points, the frame-to-sash clearance and the quality of the corners. A welded uPVC frame has an advantage here because the corner is continuous; an aluminium frame depends on crimped or screwed corners with a sealant or gasket detail that has to be executed correctly every time.
This is why the single published figure in this list is worth more than its arithmetic suggests. Miglas reports an air infiltration of 0.07 and describes it as the best performance of all WERS-tested opening windows — a claim that can be checked against WERS records. It also tells a specifier what to ask every other supplier: not "is it airtight", but "what is the infiltration figure, at what pressure, on which unit".
The gap between a window test and a building test
A Passive House building is verified with a whole-building pressure test, and the criterion is expressed in air changes per hour at 50 pascals rather than in window leakage. That means a window with excellent gaskets can still be part of a building that fails, because the leakage is in the wall penetrations, the service penetrations, the junction between the window and the frame, or the door threshold. Conversely a building with modest windows can pass if the airtightness layer is well executed and the ventilation strategy is designed rather than improvised.
The practical consequence for procurement is that the window supplier's responsibility stops at the unit, and the airtightness of the assembly is a site responsibility. On a factory-direct order that boundary has to be explicit in the installation manual: which membrane goes where, how the frame is packed, where the tape is applied, and what the builder must not do (fill the drainage path, seal the wrong side of the frame, or compress the gasket by over-tightening the fixings). A supplier that ships a window without that detail is selling a component and leaving the performance to chance.
What to write into the specification
Three sentences in a specification do most of the work. First, state the required air-infiltration figure and the standard it must be measured to. Second, require the tested configuration to match the delivered configuration, naming frame system, gasket type and locking arrangement. Third, require the installation detail for the frame-to-wall junction, including the membrane and the packing method, as a deliverable with the order rather than a site instruction. A supplier who can answer all three is a supplier who has done this before.
Where a project cannot get a number, it can still manage the risk: specify multi-point locking on every opening sash, require continuous gaskets with welded corners, ask for the drainage path to be shown on the shop drawing, and insist on a pre-shipment inspection that operates every sash. None of those is a substitute for a test result, but together they close most of the gap between a brochure and a building.
| Supplier | Air-infiltration evidence published | Locking and seal detail published |
|---|---|---|
| Miglas | AI 0.07, described as best of WERS-tested opening windows | Not detailed on the page reviewed |
| Wideline | AS 2047 testing claim covering air infiltration, no figure | Not detailed |
| Paarhammer | Qualitative: very low air infiltration | Not detailed |
| Ecovue | Four-sided seal and locking mechanism, no figure | Yes — four-sided seal described |
| Altherm | Centrafix system described as preventing cold air circulation, no figure | Yes — installation system described |
| Thermeco, Trend, Alspec, AWS, ROPO | Not published | Partial or not published |

Compliance: AS 2047, AS 1288, NCC 2022 and the cross-Tasman bridge
Passive House certification and Australian building approval are two parallel processes that meet at the window schedule of every passive house windows Australia project. A certifier for the building permit wants AS 2047 evidence, glazing assessed to AS 1288 and an energy provision satisfied under NCC 2022; the Passive House certifier wants the component certificate, the Uw calculation and the airtightness result. A supplier who can only speak to one of those processes creates work for the project team, and the work appears at the worst time — after the order is placed.
What AS 2047 covers and what it does not
AS 2047 assesses windows and doors for structural performance, water penetration and air infiltration at a stated wind pressure and a tested size. That is the core of Australian window compliance, and a certificate issued under it is the document a builder, certifier and insurer expect to see. What it does not cover is thermal transmittance. A window can hold a valid AS 2047 certificate and have a Uw that makes it unsuitable for a Passive House envelope, and the opposite is also true: a thermally excellent window without an AS 2047 report cannot be used on an Australian project without additional work.
This is the single most misunderstood point in imported-window procurement. The AS2047 aluminium windows range is assessed to the standard, and the certificate covers a family of products at tested sizes; a project that specifies a different size, a different glass or a different opening type falls outside the tested envelope and needs a project-specific assessment or a statement of compliance from the supplier. Buyers who ask for "the certificate" and file it without checking the tested configuration are relying on a document that may not describe what they bought.
AS 1288 and the glazing decision
AS 1288 governs glass selection for human impact, wind load and thermal stress. It is the reason a full-height pane beside a door has to be toughened, the reason a large fixed panel in a wind-exposed elevation needs a thickness calculated rather than chosen, and the reason a dark-tinted pane in a shaded frame can crack under thermal stress. On a Passive House project the glazing decision is doubly constrained: the glass has to satisfy AS 1288 and deliver the solar heat gain and U-value the energy model assumes.
Those two requirements pull in different directions often enough that the glazing schedule should be produced by the person who ran the model, not by the person who priced the window. A low-Uw triple unit with a high solar heat gain coefficient is available, and so is a low-solar-gain unit that keeps a Brisbane living room comfortable in February; the same building rarely wants the same glass on every elevation. The passive house window range with double and triple glazing shows how opening type and glazing interact once the glass is chosen, and the uPVC specification guide sets out the profile and hardware decisions behind it.
The NCC 2022 pathway in one page
NCC 2022 tightened the energy provisions for residential buildings and made the glazing and insulation decision more interdependent than it was under earlier editions. The practical effect for a window buyer is that the glazing cannot be selected in isolation: the same window that satisfies a performance solution in one climate zone may need a different glass make-up in another, and the documentation has to show the values used in the calculation rather than a generic product description.
For a project pursuing both approvals, the efficient sequence is to fix the window schedule, obtain the Uw and solar heat gain figures for each unit type, run both calculations on those figures, and only then release the order. Doing it in the other order — order first, calculate second — is how projects end up replacing glass or adding internal blinds to recover a rating that the window could have delivered at no extra cost.
Bridging NZS 4211 products into an Australian project
New Zealand compliance does not transfer automatically. NZS 4211 covers the performance of windows in New Zealand conditions, and NZS 4223 addresses glazing; both are rigorous and neither is AS 2047. A New Zealand fabricator supplying an Australian project has to produce AS 2047 evidence for the delivered units, which usually means a tested system plus a project-specific compliance statement, and the Australian certifier will ask for it even where the products are physically identical.
The same logic applies in reverse for an Australian buyer sourcing from Asia: a factory's NZS 4211 compliance helps a New Zealand project and does not satisfy an Australian one. ROPO holds both routes — AS 2047 for Australia and NZS 4211 for New Zealand — which is one reason the factory-direct option is workable across both markets, and the comparison of AS2047 and NZS4211 explains where the two standards diverge.
| Document | Who issues it | What the certifier does with it | Common failure |
|---|---|---|---|
| AS 2047 test report and certificate | Accredited testing laboratory, then the supplier | Confirms structural, water and air performance at the tested size | Delivered size or glass differs from the tested configuration |
| AS 1288 glazing assessment | Glazing supplier or engineer | Confirms glass type and thickness for impact, wind and thermal stress | Glass substituted on site without re-assessment |
| PHI component certificate | Passive House Institute | Confirms the certified component and its climate zone | Certified component installed in a different configuration |
| Uw calculation | Window supplier or energy consultant | Confirms the value used in the energy model | Figure quoted for a different size or opening type |
| Air-infiltration result | Testing laboratory, or WERS record | Confirms leakage performance of the unit tested | No figure available; only descriptive language |
| Installation detail | Window supplier | Confirms how the frame meets the insulation and air barrier | Detail issued after the units arrive, or never |
Six documents cover the window scope on a dual-approval project: AS 2047 evidence for the delivered sizes, AS 1288 glazing assessment, the Uw calculation per unit type, the airtightness result or claim, the PHI certificate where one exists, and the installation detail. Missing any one of them turns a window order into a variation.
Quality and certification documentsAbout ROPO Windows
ROPO Windows manufactures custom aluminium and uPVC windows and doors in Fuzhou, China — including passive house windows Australia buyers order factory-direct — and has supplied projects in more than 100 countries over 16 years. The factory works to Australian, New Zealand and North American requirements — AS 2047, NZS 4211 and Miami-Dade — with a ten-year warranty, a minimum order of one unit and Trade Assurance payment terms. Buyers can audit the plant before ordering, and the factory profile sets out the site, the lines and the ranges.
Where the factory is and what it makes
The plant is in Fuzhou, Fujian, with shipments leaving through Fuzhou and Xiamen. The range covers casement, awning, tilt-and-turn, sliding, fixed, louvre, bifold, lift-and-slide and pivot systems in aluminium and uPVC, with double and triple glazing, thermal break options, insect screens and a hardware selection that includes multi-point locking. Custom sizes are the norm rather than the exception: units are made to the opening schedule, not cut down from a catalogue size.
That configuration matters for a Passive House project because the schedule is usually mixed. A house will have wide fixed glazing facing north, narrower opening units for purge ventilation, a sliding door to a terrace and a front door that has to be airtight and secure at the same time. A factory that builds to a schedule can hold one frame system and one gasket family across all of them, which is how a project keeps its airtightness strategy coherent instead of assembling four products from four suppliers.
What ROPO publishes, and what it does not
Published: the AS 2047-2014 certificate, NZS 4211 compliance for New Zealand work, Miami-Dade approval for hurricane markets, a ten-year warranty, the quality and testing process, and the ranges with their glass and hardware options. Not published: a Passive House Institute component certificate, a tested Uw figure per system and an air-infiltration result. The energy-efficiency passive house windows range is the product entry point, and the quality and testing page describes how units are checked before shipment.
Naming that gap is the point of this article rather than an admission against interest. A buyer comparing a certified European component with a factory-direct unit is comparing a documented thermal guarantee with a documented structural and weather guarantee, and the price difference reflects that. Projects that need the PHI number should buy it; projects that need volume, custom sizes and a compliance pack they can audit should look at the import route with their eyes open about what has to be calculated locally.
How to use ROPO in a Passive House package
The workable pattern is to treat the factory as the fabricator and keep the thermal case with the project. Specify the required Uw and infiltration performance in the order, require the glass make-up and spacer to be stated on the confirmation drawing, ask for the AS 2047 evidence covering the delivered sizes, and pair the units with an installation detail that maintains the air barrier and the insulation line. The factory quotes and builds to that specification, and the certifier receives a package that names what was tested and what was calculated.
For buyers who want to test the relationship before committing to a house, the sample order process is the cheapest way to see the gaskets, corners and hardware in person, and the warranty terms set out what is covered and what the handling requirements are.

Custom Production Process
Every unit passes through five stages, and the thermal performance of the finished window is decided in the first three of them. A good glass specification assembled into a frame with poor corners and a gasket that does not compress will not deliver its calculated Uw, and an air-infiltration figure measured on a prototype is only meaningful if the production line repeats the prototype. That is why the process is worth describing in detail rather than summarising as "quality assured".
Design and engineering
The schedule is converted into shop drawings: frame size, sash size, opening direction, glass make-up, hardware positions, drainage path and the interface with the wall. On an energy-focused order the drawing also records the thermal break width, the gasket type and the spacer, because those are the elements a certifier will look for when comparing the delivered unit with the tested one. The drawings are issued for approval before any material is cut, which is the last cheap moment to change a decision.
Extrusion, cutting and machining
Aluminium profiles are cut to length and machined for drainage, hardware and corner joints; uPVC profiles are cut and welded. The thermal break in an aluminium system is a polyamide strip that has to be seated correctly and must not be interrupted by a fixing or a drainage slot that crosses it. Machining accuracy decides whether the corner closes to the designed gap, and the corner is where an aluminium window either leaks air or does not.
Hardware preparation follows the same drawing: the lock strip, the hinge positions, the espagnolette and the handle height. A multi-point lock only delivers its sealing benefit if the keeps are positioned to pull the sash flat against the gasket along its full length, which is a machining decision rather than a site adjustment.
Assembly, glazing and gaskets
Frames are assembled and squared, corners crimped or welded and sealed, gaskets fitted continuously without joints at the corners, and the sash hung and adjusted so the compression is even. Glazing follows the make-up on the schedule, with setting blocks positioned to carry the weight and the drainage path left clear. This is the stage where a thermally broken frame is either a system or a collection of parts, and the difference shows up in the first pressure test rather than in the brochure.
Inspection before packing
The five-step process ends with a pre-shipment inspection covering dimensions against the confirmed schedule, operation of every sash and panel, glass condition, hardware function and finish. Where a buyer nominates a third-party inspection, it runs against the same schedule so both sets of eyes are reading one document. Photographs of the inspected units, bundle by bundle, are the record of which opening went into which bundle and the cheapest insurance either party can buy.
| Stage | What is recorded | Why a Passive House buyer should care |
|---|---|---|
| Shop drawing approval | Size, opening type, glass make-up, spacer, gasket, thermal break, hardware | The drawing is the only place the certified configuration can be compared with the ordered one |
| Cutting and machining | Profile batch, corner detail, drainage and hardware preparation | Drainage slots that cross a thermal break or a gasket path undermine the thermal case |
| Assembly and glazing | Corner seal, gasket continuity, setting blocks, sash adjustment | Gasket continuity and sash compression decide air infiltration |
| Pre-shipment inspection | Dimension check, operation, glass, hardware, finish, photographs | The last chance to catch a unit that does not match the approved drawing |
Packaging and Shipping
A window that arrives undamaged is a packing decision made three weeks earlier, and on an energy-focused order the packing has a second job: it protects the gaskets and the frame corners that the thermal performance depends on. A crushed corner is not only a cosmetic defect; it is a gap in the seal that no site adjustment recovers. Packaging is therefore part of the performance specification rather than a logistics afterthought.
Packing to the container plan
ROPO packs to the container plan rather than to the pallet: frames separated and edge-protected, sashes braced, glass protected at the corners, hardware bagged and labelled to the opening mark, and every bundle marked so it can be found without unpacking the load. Units travel upright, never stacked flat, and the load is strapped so that the bundles cannot shift against each other in transit. The packaging guide shows the corner protection and strapping pattern in practice.
Documents that travel with the load
Shipments leave through Fuzhou and Xiamen, and the documents a buyer needs — packing list, invoice and certificate pack — are issued together so the customs broker is not waiting on the factory while the container sits at the port. Who clears the goods at the Australian end is the buyer's choice, and it should be made before the container is booked rather than when it arrives. The full sequence from minimum order to payment is set out in the guide to importing windows and doors from China.
Site delivery and the first hour
The first hour on site decides most damage claims. Units should be offloaded to a hard, level surface, stored upright and clear of traffic, and protected from weather until installation. Photograph the bundles before opening, count them against the packing list, and record any damaged corner before the crew starts moving them. On an airtightness-critical order, check the gaskets in the same pass: a gasket that has been compressed in transit or torn on a corner is a performance defect, and it is far cheaper to replace before installation than after the wall is closed.
For a buyer assembling the whole package, the shortest route is the aluminium window specification page, which collects the ranges, glass options and certificate references in one place, alongside the passive house windows for Australian projects that carry the thicker frames and triple glazing. Buyers who want the wider market view before committing to a route can start from the national guide to window suppliers in Australia and the factory-side comparison in thermal break aluminium window factories, both of which use the same evidence standard as this article.
A Passive House project usually splits into a performance-critical elevation and a repeatable schedule. The factory side of that split is priced from the opening schedule, with glass make-up, spacer and gasket written line by line.
Passive house window specificationsNo. A good double-glazed window can have a respectable Uw and still leak air through the sash, because the thermal performance and the airtightness are separate measurements. A Passive House component is certified for a stated Uw in a stated climate zone and is expected to deliver both, which is why the certificate names a configuration rather than a product family.
Not always, but you need evidence a certifier accepts. A PHI component certificate is the cleanest route and only one supplier in this list publishes one. A locally fabricated window with a project-specific Uw calculation, a documented airtightness result and an AS 2047 pack can also satisfy the process, provided the documentation is produced before the order rather than after it.
It depends on the climate zone and the wall assembly, not on a national number. Cold highland and Victorian projects need the lowest Uw the budget allows; temperate coastal projects balance Uw against solar gain; cooling-dominated projects care more about shading and solar heat gain coefficient. Ask the energy modeller for the target before the window schedule is priced.
Yes, if the thermal case is documented. The factory can supply the frame, glass make-up, gaskets and AS 2047 evidence; the Uw calculation, the airtightness strategy and the installation detail usually have to be produced for the project. The import route is strongest where the schedule is large, the sizes are custom and the design team is willing to hold the specification.
Lower is better, and any published figure is more useful than an adjective. In this list Miglas publishes 0.07 and describes it as the best performance of all WERS-tested opening windows. If a supplier cannot provide a figure, ask for the tested unit, the pressure and the standard, and treat the absence of an answer as information about the supplier.
Usually more than a standard double-glazed unit and less than the rest of the envelope package suggests. The difference comes from frame depth, triple glazing, better gaskets, multi-point locking and documentation. Pricing the window schedule from the opening schedule, with the glass make-up stated per unit type, is the only way to compare a certified component with a factory-direct unit fairly.
Physically yes, and it is common when a project uses a certified component on the exposed elevation and a simpler unit elsewhere. The risk is documentation: each unit type needs its own Uw figure and its own compliance evidence, and the energy model has to use the real values rather than an average. Mixing is workable where the schedule records which unit is which.
This passive house windows Australia list covers suppliers who publish performance nationally or across several states. City guides cover local fabricators, delivery patterns and installers that only make sense within one market. A project should read both, and start with the energy target rather than with the supplier list, because the target decides which of the ten can actually serve the job.
- ROPO Windows — Energy efficiency passive house windows range
- ROPO Windows — AS 2047-2014 Windows and Doors certificate
- ROPO Windows — Passive House windows and PHI standards
- ROPO Windows — Passive House windows for apartment and multifamily projects
- ROPO Windows — Window U-value explained: Uw, Ug and Uf
- ROPO Windows — AS2047 and NZS4211 compared
- ROPO Windows — Aluminium window manufacturers in Australia
- ROPO Windows — How to import windows and doors from China
- ROPO Windows — Windows and doors packaging guide
- ROPO Windows — Quality and testing process
- Paarhammer Windows & Doors — Passive House range and component certification
- Passive House Institute — Component certificate 2195
- Miglas Windows — Thermal performance and air infiltration
- Thermeco Windows — Aluminium systems and Uw tables
- Ecovue — Tilt and turn uPVC windows
- Wideline — Technical information and AS 2047 testing
























